Below are the different permits issued and the fees for each:
 

                                                                                                            Demolition: $20.00

                                                                                                            Moving: $20.00

                                                                                                            Re-inspection (3rd and Subsequent): $30.00

                                                                                                            Fireworks (Standby): $100.00

                                                                                                            Fire watch: $100.00

                                                                                                            Assembly (Standby): $25.00

                                                                                                            Plans Review: $25.00 (plus $1.00 per 5,000 sq. feet, up to $30.00 maximum)

                                                                                                            Hazardous Material Recovery: (Actual Cost)

                                                                                                            Hydrant Testing: $30.00 per hydrant

                                                                                                            Fire Flow Report: $200.00

                                                                                                            Copies of Reports: $5.00

                                                                                                            Cutting and Welding: $25.00

                                                                                                            Fireworks: $130.00

                                                                                                            Burning: $35.00

                                                                                                            Hazardous Materials Storage: $120.00 per year

                                                                                                            Tent: $40.00

                                                                                                            Tank Removal/Installation: $50.00

                                                                                                            Hazardous Materials Operations: $100.00 per year